文件类型:PDF文档
文件大小:117K
PROBLEM TO BE SOLVED : To reduce frequencies and noises caused on a pumping operation and smoothly pump the earth and the sand by mixing a penetrating agent-added mud-making material into earth and sand. ŽSOLUTION : When dug surplus soil is transported on the ground, a low foamable nonionic surfactant as a penetrating agent is added to a mud adding material to be fed into a mud pressure shielding machine 1 to produce the additive for pumping, and the non-ionic surfactant-added dug earth and sand are pumped. By the employment of the pumping method, frequencies and noises can be reduced, when the dug earth and sand are pumped from the mud pressure shielding machine 1. ŽCOPYRIGHT : (C)2004, JPO Ž