分享好友 知识库首页 频道列表

STRUCTURE FOR CONTROLLING TERMITE

2025-06-17 20:141450下载
文件类型:PDF文档
文件大小:312K
PROBLEM TO BE SOLVED : To provide a structure for controlling termite easy for installation, excellent in stability, capable of blocking the invasion of termites from the surroundings of piping and/or the surrounding of a water drainage hole, from where the termites invade especially easily, without using a harmful chemical and also capable of controlling humidity under a floor. SOLUTION : The structure for controlling termite is produced by installing a clamp around piping and/or a water drainage hole passed through an earth floor structure under the floor of a construction, and piling silica gel in the clamp by a desired thickness to form the termite-controlling layer. The clamp is formed by preferably using a cylinder having a ≥14 cm inner diameter and a ≥3 cm height, and also the edge of ground-contacting surface of the clamp is preferably sealed. COPYRIGHT : (C)2010, JPO&INPIT


请登录查看


反对 0
举报 0
收藏 0
打赏 0
评论 0