文件类型:PDF文档
文件大小:623K
This earth hills is avoided from being created is proposed is, the production of the device against moles products, with the aid of single conical, are to be accommodated in the recesses, which previously with the aid of the proposed device in upper layers of the deck in a directly by the lawn chess order be made are to be wedged, wherein the products into the cavities with the aid of the same device. The disadvantage is in the necessity for conducting the additional work, are connected to the wedge of the products into the depressions. The disadvantage of the proposed device is not only their low tine number, but also the absence of the possibilities for the attachment of the device on any technique. The new procedure and the devices allow, to overcome the above mentioned disadvantages. To can be attached to increase the productive possibilities of the method has, the device (4) more than four prongs (6) and on any technique. Even for increasing the productive possibilities of the process shall be required to record the elongate products (1) into a previously product block (11) in the prepared ground recesseschess order and thereafter in a (2) in the casual location adjusted.