分享好友 知识库首页 频道列表

BAGGING AND DEWATERING METHOD AND ITS EQUIPMENT

2025-06-19 04:234420下载
文件类型:PDF文档
文件大小:209K
PROBLEM TO BE SOLVED : To stabilize the amount of packed earth and sand in a bagging and dewatering method for packing water-containing earth and sand of mud, especially of mud comprising cohesive soil or silt in a water-permeable bag body to perform dewatering. SOLUTION : In this method, when the water-containing earth and sand of mud etc. is packed in the water-permeable bag body 9 by a packing pump 8P, and the moisture of the content in the bag body 9 is made to permeate outside the bag body 9 to be dewatered, a weight measuring process for measuring the weight of the water-containing earth and sand 1, a water addition process for adding water to the weighed water-containing earth and sand 1 so as to adjust its water content to a prescribed value based on the result of the weight measurement and the known water content of the water-containing earth and sand 1, a weighing process for weighing the water-added water-containing earth and sand, and a packing process for packing the weighed water-containing earth and sand in the bag body are carried out. COPYRIGHT : (C)2007, JPO&INPIT


请登录查看


反对 0
举报 0
收藏 0
打赏 0
评论 0