Method for constructing dam dock and mono rail using incline equipment 发明授权

2023-05-12 1360 567K 0

专利信息

申请日期 2025-09-13 申请号 KR1020140183131
公开(公告)号 KR101566130B1 公开(公告)日 2015-10-29
公开国别 KR 申请人省市代码 全国
申请人 DAEWOO ENGINEERING CONSTRUCTION CO LTD; KOREA WATER RESOURCES CORPPRATION; DAELIM INDUSTRIAL CO LTD; HYUNDAI ENGINEERING CONSTRUCTION CO LTD
简介 The present invention provides a construction method for a dam dock and a mono rail using incline equipment, capable of providing a dock and enabling the maintenance of a dam by installing a rail car and a floating unit for a dock after installing the incline equipment for ascent and the incline equipment for descent in the dam. According to a proper embodiment of the present invention, the construction method includes : (a) a step of constructing a stair block for installing a rail on the lower side of a dam to have the same grade as a slope on the lower side of the dam by locating the stair block to be adjacent to the inside of an area of a cross section of an end on one side of the dam to be constructed on the lower side of a valley slope; (b) a step of installing the incline equipment for ascent on the stair block for installing the rail on the lower side and installing the incline equipment for descent on the upper side of the valley slope in the height direction of the dam; (c) a step of repeating a process and forming a concrete placed layer up to a completed construction height of the dam, wherein the process includes loading up concrete to be placed, which is manufactured in a batcher plant constructed on a site on the upmost side extended from the valley slope, placing the concrete by moving the dump truck to the lower part of the dam using the incline equipment for descent, and moving the dump truck to the upper part of the dam using the incline equipment for ascent again; (d) a step of connecting the floating unit for the dock, floating for an arrival and embarkation according to a water level in the upper side in the dam, to a descending rail remaining after being demolished among the incline equipment for descent when the placement of the concrete is completed and the dam is constructed up to the completed construction height; and (e) a step of installing a rail car for safety in the incline equipment for ascent, for tourists or for dam inspection.COPYRIGHT KIPO 2016


您还没有登录,请登录后查看下载地址


反对 0举报 0 收藏 0 打赏 0评论 0
下载排行
网站首页  |  关于我们  |  联系方式  |  使用协议  |  版权隐私  |  网站地图  |  排名推广  |  广告服务  |  积分换礼  |  网站留言  |  RSS订阅  |  违规举报  |  京ICP备2021025988号-4