客服热线:18202992950

Controlling and monitoring production of gas from drilled well in geological reservoir, comprises w 发明申请

2023-08-16 3190 147K 0

专利信息

申请日期 2025-08-15 申请号 FR10002922
公开(公告)号 FR2962480A1 公开(公告)日 2012-01-13
公开国别 FR 申请人省市代码 全国
申请人 INST FRANCAIS DU PETROLE
简介 The present invention relates to a method of control and follow-up of the production of a gas starting from a drilled well, in particular in a geological reserve of weak permeability and porosity, in which one carries out the following stages : - one takes gas samples in the course of production of the well, - one takes measurements of concentration of at least two rare gas isotopes contained in the samples, and one calculates at least two isotopic reports/ratios, - one deduces from the measured isotopic reports/ratios, the curve of distillation which gives the report/ratio F of the quantity of gas produced on the producible quantity of gas by the well, for each taking away.


您还没有登录,请登录后查看下载地址


反对 0举报 0 收藏 0 打赏 0评论 0
下载排行
网站首页  |  关于我们  |  联系方式  |  使用协议  |  版权隐私  |  网站地图  |  排名推广  |  广告服务  |  积分换礼  |  网站留言  |  RSS订阅  |  违规举报  |  京ICP备2021025988号-4