客服热线:18202992950

CONSTRUCTION METHOD FOR EARTH-RETAINING PREBUILT SOLDIER BEAM 发明申请

2023-05-01 3060 58K 0

专利信息

申请日期 2025-06-25 申请号 JP2005003756
公开(公告)号 JP2006193896A 公开(公告)日 2006-07-27
公开国别 JP 申请人省市代码 全国
申请人 TODA CONSTRUCTION
简介 PROBLEM TO BE SOLVED : To reduce a construction period and costs when an underground exterior wall is required in the demolition of an existing building, in terms of a construction method for an earth-retaining prebuilt soldier beam. SOLUTION : In this construction method for the earth-retaining prebuilt soldier beam, the underground exterior wall 3 and pressure-resistant slab 4 of the existing building are left behind after the demolition and removal of the existing building; the soldier beam 5 is erected inside the exterior wall 3 by being supported by the exterior wall 3 and the slab 4; horizontal sheathing is horizontally laid between the soldier beams; and a new building is constructed inside the horizontal sheathing between the soldier beams. COPYRIGHT : (C)2006, JPO&NCIPI


您还没有登录,请登录后查看下载地址


反对 0举报 0 收藏 0 打赏 0评论 0
下载排行
网站首页  |  关于我们  |  联系方式  |  使用协议  |  版权隐私  |  网站地图  |  排名推广  |  广告服务  |  积分换礼  |  网站留言  |  RSS订阅  |  违规举报  |  京ICP备2021025988号-4